NC SP-PH License Guides

Straight answers to the questions people actually ask before sitting the NC Special Restricted Plumbing & Heating electrical exam — cost, difficulty, the steps to get licensed, and how SP-PH differs from SP-FALV.

⭐ How to Pass — The Complete Study Plan

Start here. The full game plan: the right mindset, a week-by-week schedule, how to use every tool on this site, and a pre-exam checklist. Pairs with the exam-day strategy.

How to Get the SP-PH License

The full path: experience requirements, application, scheduling with PSI, and what happens after you pass.

Exam-Day Strategy

Time budgeting, the two-pass method, when to look up vs. answer, and the traps that sink people.

How Much Does It Cost?

Every fee broken down — exam, license, books, and prep — plus the realistic total to get licensed.

How Hard Is the Exam?

What 40 open-book questions in 3 hours really feels like, why people fail, and how much to study.

SP-PH vs SP-FALV

Two NC restricted classifications, two different jobs. Which license matches the work you actually do.

Ready to study?

Free practice questions, each tied to the exact NEC article.

Start the Practice Exam → See the Required Books